CSAH 40 RECONSTRUCTION PROJECT
SAP 013-640-001, SAP 013-630-019, CP 13-59-23 Chisago County, MN
The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities ITEM NO. | | DESCRIPTION | | UNIT | EST. QTY. | 2101.505 | | GRUBBING | | ACRE | 1.96 | 2104.503 | | REMOVE PIPE CULVERTS | | LIN FT | 682 | 2104.504 | | REMOVE BITUMINOUS PAVEMENT | | SQ YD | 10940 | 2106.507 | | EXCAVATION - COMMON AND SUBGRADE | | CU YD | 59322 | 2106.507 | | SELECT GRANULAR EMBANKMENT (CV) | | CU YD | 31269 | 2106.507 | | COMMON EMBANKMENT (CV) | | CU YD | 14072 | 2108.504 | | GEOTEXTILE FABRIC TYPE 9 | | SQ YD | 8000 | 2211.507 | | AGGREGATE BASE (CV) CLASS 5 | | CU YD | 8114 | 2221.509 | | SHOULDER BASE AGGREGATE CLASS 5 MOD | TON | 1336 | 2360.509 | | TYPE SP 9.5 AND 12.5 WEARING COURSE MIX | TON | 7913 | 2360.509 | | TYPE SP 12.5 NON WEAR COURSE MIX | TON | 4920 | 2501.502 | | RC PIPE APRON AND SAFETY APRON | | EACH | 22 | 2501.502 | | GS SAFETY APRON & GRATE | | EACH | 24 | 2501.503 | | CAS PIPE CULVERT | | LIN FT | 590 | 2501.503 | | RC PIPE CULVERT DES 3006 CL III | | LIN FT | 816 | 2506.502 | | CONST DRAINAGE STRUCTURE | EACH | 1 | 2511.507 | | RANDOM RIPRAP | | CU YD | 130 | 2564.618 | | SIGN | | SQ FT | 453.6 | 2573.503 | | SILT FENCE, TYPE MS | | LIN FT | 11970 | 2573.503 | | SEDIMENT CONTROL LOG TYPE STRAW | | LIN FT | 620 | 2574.507 | | FILTER TOPSOIL BORROW | | CU YD | 581 | 2575.504 | | ROLLED EROSION PREVENTION CATEGORY 25 | SQ YD | 14870 | 2575.505 | | SEEDING | | ACRE | 11.4 | 2575.523 | | RAPID STABILIZATION METHOD 3 | | M GALLON | 68.4 | 2582.503 | | SOLID LINE PAINT | | LIN FT | 20696 | 2582.503 | | 4” DBLE SOLID LINE PAINT | | LIN FT | 3800 | 2582.518 | | PAVT MSSG PAINT | | SQ FT | 334 |
|
|
2/23/2023 10:00 AM
|
|
3/21/2023 1:00 PM
|
|
Quest # 8352824 via www.questcdn.com
|
|
E-Bidding via QuestCDN
|
|
N/A
|
|
Direct questions about this Project to Ben Hobert at 651-213-8723 or email at ben.hobert@chisagocountymn.gov.
|
|
Yes
|
|
$30.00
|
|
Information and Bidding Documents for the Project can be found at www.questcdn.com. Bidding Documents may be downloaded from the website for a nonrefundable fee of $30 by inputting Quest project number Quest # 8352824 on the website’s Project Search page. Bidders are also required to pay a $45 online bidding fee.
|
|
M - F 7:00 AM - 3:00 PM
|
|
651.213.8772
|
|
All plan holders information for the Project can be found at www.questcdn.com.
|
|
The prime contractor is responsible to ensure that its workers and those of all subcontractors are compensated according to the MN/DLI state prevailing wage determination(s) incorporated into and found elsewhere in this contract. All contractors shall pay each worker the required minimum total hourly wage rate for all hours worked on the project and for the appropriate classification of labor.
|
|
|